A2.GO Update 10
Where we last left off our wagon update, the motor was in, and mostly hooked up. Now we needed to hook up the remaining elements, mainly the front end, intercoolers, […]
Where we last left off our wagon update, the motor was in, and mostly hooked up. Now we needed to hook up the remaining elements, mainly the front end, intercoolers, […]
In this update, we finally get the engine in! That’s right, the time has come to get the engine in its place. It’s worth noting that up until this point, […]
When we last left off on the Avant Resto Project, we had just completed the clutch and valve cover seals. Today we are moving a few more steps closer to […]
In this update we tackle the valve covers and the seals for them. Our Avant resto project has come a long way from its origins as a beat down, slow […]
In this update we finish up the transmission for our avant with a fresh clutch install from Southbend. At this point in the project, our engine and transmission were starting […]
In this update for the Avant Resto Project, we’ll cover the prep for our 01e six-speed transmission and the slave cylinder installation. While the six-speed from our donor car came […]
Update 4 is a large one, with lots of small stuff happening since we gave our last update. Since it’s been a while, we figured a quick recap would be the best way […]
This years Waterfest was a wet and hot one. The annual NJ show was held at its usual spot in Englishtown and while the rain was heavy on Saturday, turnout […]
For our second update we are keeping it short and sweet. We pulled the motor from the wagon and began taking it apart for recycling and parts we plan on […]
For those of you just joining us now, a quick refresh is in order. A few weeks ago we announced that we were starting the Avant 2.go project. The new […]